Engineering Method Summary
It is possible to design and construct economically and aesthetically. Quality of the cross section is constant.
Eco-friendly engineering method by reducing waste materials due to minimum molding work on site
Advantages
Construction period reduces because manufacturing inside the factory enables to produce even weather condition is not suitable for construction.
Since plastering work is not required for precast concrete due to quality improvement, and reduction in crack defects by high strength concrete.
Easy to secure workforce, reduced safety accidents
Excellent exterior finish and precise construction are available
Site View
Construction Process
-
PC Column
Installing
-
RC Column
Placing
-
Raker Girder
Installing
-
PC Stand
Installing
-
Wall and Step
Installing
-
Detail Joint Drawing