Precast Concrete

Production Capacity

Precast Concrete Production Capacity
Production line B/P(Batch Plant)
PS line 600ton : 56m x 1.2m x 1line
600ton : 35m x 1.2m x 1line
500ton : 80m x 2.4m x 4line
500ton : 56m x 1.2m x 2line
350ton : 80m x 1.4m x 1line
350ton : 80m x 2.4m x 1line
350ton : 56m x 1.2m x 1line
350ton : 40m x 2.4m x 1line
350ton : 35m x 1.2m x 3line

Non PS 50m x 1.5m x 4line
100m x 20m x 3line
Mixer(Twin Shaft Pan) 180㎥ / Hr x 1 (Agitator 3㎥)

Metering Way :
 automatic measuringLoad Cell type
Measuring error :
 One-time weighing standard
water :
 -2%, +1%
cement :
 -1%, +2%
sand :
 ±3%
gravel :
 ±3%
chemical admixture :
 ±3%
admixture :
 ±2%
Aily production capacity : 300㎥
Annual production capacity : 90,000㎥
Precast Concrete Manufacture Equipment
Facility size
Tower Crane : 25 ton x 1Unit
Overhead Crane : 40 ton x 1Unit
30 ton x 5Unit
20 ton x 4Unit
10 ton x 2Unit
6 ton x 2Unit
Gantry Crane : 30 ton x 4Unit
Semi Gantry Crane : 30 ton x 3Unit
20 ton x 1Unit
15 ton x 1Unit
Single stage tensioner : 30 ton(double type) x 6Unit
Tensioning machine :
600 ton(Double cylinder) x 2Unit(tension,elongation automatic recording)
500 ton(Double cylinder) x 6Unit(tension,elongation automatic recording)
350 ton(Double cylinder) x 7Unit(tension,elongation automatic recording)
Bar bender : Automated machines(1Day 20ton Processing ability) x 2Unit
Recharge product Transfer truck : 60 ton x 1Unit
Winch type Transfer truck : 60 ton x 3Unit
Concrete Transfer equipment(5㎥) : 50m/min
Concrete Placing(5㎥) : 15m/min x 4Unit
Concrete Transfer Placing(Tucker bilt) : 5㎥ x 2Unit
Pay Loader : 2㎥ x 1Unit
Fork lift: 7 ton x 1Unit, 18 ton x 1Unit
Boiler : 4,000kg/hr x 2Unit(LNG)
Storage size
Cement Silo : 300ton x 1Unit, 100ton x 1Unit
S/P SILO : 100ton x 1Unit
Admixture Tank : 10 ton x 1Unit
Fine aggregate : 500㎥ x 2 Unit (aggregate yard)
coarse aggregate(25mm) : 500㎥ x 2 Unit (aggregate yard)
coarse aggregate(20mm) : 500㎥ x 1 Unit (aggregate yard)
elevated tank : 20 ton
hot water storage tank : 10ton(Heater Installation)
LNG TANK : 30ton
open storage yard : 120,120㎡
 
Precast Concrete
In the construction site, the concrete construction material is poured into the mold of various forms in the factory, unlike the field pouring concrete that is poured out concrete to produce a temporary frame (dies), and is transported in the field by the transport vehicle after curing.
Precast Concrete Overview
Perfect Quality Control
- Minimize construction error with the best quality and optimized structure design
   in automated factory
- Enhancing structure’s durability by minimizing cracks
Reduction of Construction Cost
- Total Cost Reduction Effect / Modular concrete members procure economics
   through reduction of construction period
Reduction of Construction Period
- 30% reduction of construction period by site assembly method compared
   to cast-in-place concrete method
- Reduction of construction period by early starting follow-up process
   (electrical, facility, finishing work)
- Construction during winter season is available
Simplification of Site Work
- Highest quality construction with the minimum manpower is available because of less site process and simple work
Eco-friendly Product
- Precast Concrete is considered to be an Eco-friendly construction product. Because it is designed on the basis of assembly
   method engineering, it can minimize construction site’s environmental damages, such as dust or noise, and it is easy to construct
   on various sites’ condition